Sponsors rarely fail to raise capital because the money was not available. They fail because the structure they presented asked the wrong providers to carry the wrong risks at the wrong price.
The procurement habit
Most funding processes begin as a search. A requirement is established — a figure, a drawdown profile, a term — and the sponsor sets out to find it. Lenders are approached in sequence, indicative terms are collected, and the cheapest credible offer is pursued. The exercise is treated as procurement: capital as a commodity, distinguished chiefly by price.
The habit is understandable, because that is very nearly how corporate borrowing works for an established balance sheet with a trading history. It is not how project and asset-backed capital works. In a project financing there is no history to lend against. The lender is being asked to underwrite a set of future events, and the price it quotes is a function of how those events have been arranged — not of the market rate for money.
Every layer is a claim on the same cash flows
A capital stack is not a list of funding sources. It is a set of competing claims on a single stream of cash, ranked by priority and separated by risk. Senior debt takes the first claim and the least risk. Mezzanine, preferred instruments and equity take progressively later claims and progressively more. Each layer prices itself by reference to what stands above and below it, and by reference to how reliable the cash flow beneath all of them is judged to be.
It follows that a change to any single layer repositions every other layer. Extending the tenor of the senior tranche alters the risk profile of the mezzanine sitting behind it. Introducing a revenue floor at the operating level changes the volatility that every provider above it is being asked to absorb. Adding a completion guarantee shifts construction risk out of the credit assessment entirely. None of this is visible if the stack is treated as a shopping list, because a shopping list has no interactions.
Price follows position
The practical consequence is that the cost of capital is very largely a design outcome. Two sponsors with identical assets, identical markets and identical build programmes can face materially different pricing because one has arranged the claims well and the other has not. The difference is not negotiation; it is architecture.
Poor architecture usually shows itself in one of a few ways. Risks are left sitting with the party least able to price them. Contingency is duplicated, with each provider reserving separately against the same event. Security is over-allocated to the senior tranche, leaving nothing to support the layer that would otherwise have been the cheapest source of flexibility. Or the stack is simply too thin — a single instrument asked to absorb construction risk, market risk and refinancing risk at once, and priced accordingly.
Where structuring earns its keep
Good structuring does three things. It identifies which risks are genuinely transferable, and to whom. It allocates each risk to the party for whom it is cheapest to hold — which is rarely the sponsor and often not the lender either. And it presents the result as a single coherent proposition rather than a series of separate negotiations conducted in parallel and hoping to converge.
The gains from that work are not marginal. Repositioning a project so that its risks are held by parties equipped to price them can change the character of the credit itself, and with it the universe of capital willing to look at it at all. That is a different exercise from shaving basis points off an indicative margin, and it happens at a different point in the timeline.
Questions worth asking before the first approach
- Which risks in this project are we holding by design, and which by default?
- For each risk we are holding — is there a market that would price it more cheaply than we are implicitly pricing it ourselves?
- Does any single provider carry more than one category of risk? If so, why?
- Where is contingency held, and is the same event being reserved against more than once?
- If the senior tranche were reduced by a quarter, what would fill the gap, and what would it cost?
A sponsor who can answer those five questions has already done most of the structuring work. A sponsor who cannot is, in effect, asking the market to do it — and the market charges for that service in the margin.
Capital does not become expensive at the point of pricing. It becomes expensive at the point of design.